System overview / ACR1 / transcript

One path. Commanded departures.

Complete text and source references for the silent film. Each timed segment includes its evidence class.

Return to film →
  1. An integrated twelve-3U study.

    Twelve 4 kg 3U envelopes. Two six-level storage banks. One reusable electromagnetic carrier.

    CAD-derived Blender render
    Source: visuals/VIEW_PROVENANCE.json

  2. Select. Feed. Capture.

    A guided lead screw transfers one payload sideways into the Z-indexed lift. The lift holds the payload and captive pallet.

    CAD-derived Blender render
    Source: visuals/VIEW_PROVENANCE.json

  3. Transfer custody positively.

    Carrier bayonets and lift grip pins overlap custody at handoff. Prove the destination restraint before releasing the other.

    CAD-derived Blender render
    Source: visuals/VIEW_PROVENANCE.json

  4. Dock. Prove. Clear.

    The pallet locks to the carrier. The custody frame withdraws clear of the launch path before the shot is enabled.

    CAD-derived Blender render
    Source: visuals/VIEW_PROVENANCE.json

  5. Only the payload departs.

    The payload departs along +X. The captive pallet remains locked to the carrier through arrest and return to its loading datum.

    Operating-sequence schematic · illustrative timing
    Source: cad/release/FINAL_CAD_MANIFEST.json; analysis/COUPLED_SHOT.json

  6. Evaluate the complete trade.

    Modeled 1–3 m/s commands. Installed device allocation 156.557 kg. These preplanned mission cases show no advantage over the ideal ground-pretrimmed spring comparator.

    Computed result / G5-MISSION-01
    Source: mission/MISSION_RESULTS.csv