Continuous payload custody.
Complete text and source references for the silent film. Each timed segment includes its evidence class.
Retain the inventory.
Two fixed six-level banks hold twelve nominal 3U payloads. Select one cell and inhibit host burns during feeding.
CAD-derived Blender render
Source: visuals/VIEW_PROVENANCE.jsonCapture the selected payload.
The guided pusher feeds the lift. At source level 5 the payload floor is Z830 mm; the lift grips hold its pallet.
CAD-derived Blender render
Source: visuals/VIEW_PROVENANCE.jsonOverlap the restraints.
At handoff, positive carrier bayonets and outboard lift grip pins establish dual custody. The storage banks and fixed frame are hidden in this view for access.
CAD-derived Blender render
Source: visuals/VIEW_PROVENANCE.jsonProve the clear state.
Payload floor Z46 mm. Raised custody frame floor Z190 mm. Prove pallet locks, pusher withdrawal and a clear path before enabling launch.
CAD-derived Blender render
Source: visuals/VIEW_PROVENANCE.jsonRetain the pallet during recovery.
The payload departs along +X. Carrier and captive pallet arrest together, then return as one retained assembly for the next transfer.
Operating-sequence schematic · illustrative timing
Source: cad/release/FINAL_CAD_MANIFEST.json; analysis/COUPLED_SHOT.jsonFault → inhibit → retain → verify.
Inhibit launch, retain the payload, isolate the cell, supervise reset, then verify before continuing. Physical fault-response validation is subsequent work.
Modeled fault and isolation sequence
Source: analysis/TRANSFER_INTERLOCKS.json